Current need: ROOF | 40 000 EUR
We already have: 20 151 EUR

Brothers and sisters, dear friends!

Since 1993, as the Apostolic Church congregation in Banská Bystrica, we have moved through eight different locations. Most of these moves were due to decisions made by the landlords.

Several years ago, God began to speak to us in various ways about having our own space. He said:

I am giving you a building that will meet the needs of the church.

Those needs are to reach, motivate, inspire, and build disciples who will be released into ministry not only in Banská Bystrica, but throughout central Slovakia.

That was the beginning of the journey toward acquiring our own church building. The new church building will serve not only our local congregation, but also other Apostolic Church congregations in central Slovakia, as well as the residents of Banská Bystrica—especially in the Radvaň district, where the property is located.

Project Phases

We realize that the process of renovating a building of this type is far more complex than the following simplified outline in brief bullet points. However, we would like to present to you the challenges that lie ahead of us.

Phase One (2017–2023)

In the first phase, by God’s grace, we invested 125,000 EUR in:

  • purchasing the former heat exchange station building located in the Radvaň housing estate in Banská Bystrica, with a total area of 303 square meters,

  • acquiring the land beneath the building, and

  • completing the full project documentation.

After the renovation, the church will have 396 square meters at its disposal, as the building’s height allows for a two-story layout.

Phase 1 at 0 %
COMPLETED

Phase Two (2023-2025)

These days, we face the second phase, which involves:

  • obtaining the building permit (95% prepared),

  • renovating the roof, which is in a critical condition (work can begin immediately without the building permit, as allowed by law), and

  • completing the shell construction.

We estimate the costs associated with the second phase to be 150,000 EUR.

Phase 2 at 0 %
COMPLETED

Phase Three (2025-2027)

The third phase includes:

  • completing the interior renovation

  • and the final approval inspection (occupancy permit).

We estimate the costs associated with the third phase at 170,000 EUR.

In total, the entire new church building project will require approximately 320,000 EUR.

Phase 3 at 0 %
COMPLETED

Financing

We are grateful for God’s extraordinary guidance and provision that our congregation is experiencing these days, evidenced by acquiring the property into our ownership without any loan burden. Our gratitude also goes to each of you who have generously supported us from the heart.

How do we plan to continue financing this?

  • Monthly contributions from congregation members

  • A promised interest-free loan of 10,000 EUR

  • Donations

  • Volunteer labor

We believe that every blessing God gives to a person comes from God through people to people. Therefore, we invite you to partner with us in these areas:

  • Prayer, so that the vision of the church building becomes a reality

  • Financial support

  • Material assistance

  • Personnel support (individuals and construction companies)

Support for the new church prayer house

You can track the transparent account here.

Fio banka, a.s.
SWIFT BIC: FIOZSKBA
Account holder: Apoštolská cirkev na Slovensku, zbor Banská Bystrica

IBAN:  SK68 8330 0000 0026 0133 9922

Scan the QR code using your bank’s mobile app, and the details will be filled in automatically. You only need to enter the amount.